Elk Garden-Parr Run substation interconnection queue
1 active project totaling 15.1 MW in the PJM queue, plus 1 with terminal status (shown grayed).
2 PJM queue filings name Elk Garden-Parr Run as the point of interconnection, all in Mineral County, WV.
Target commercial operation dates as filed run from Dec 2011 to Dec 2021 (2 filings).
1active projects
15.1active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AD2-180 | Black Rock Wind | 138 | 15.1 | Wind | In Service | Dec 2021 |
| U3-025 | Elk Garden-Parr Run 138kV | 138 | 10.4 | Wind | Withdrawn | Dec 2011 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Mineral County, WV
No other substation in Mineral County, WV is named as a point of interconnection in the PJM queue.