Shady Oaks Wind Power Project

PJM queue ID AD2-134

Shady Oaks Wind Power Project (AD2-134) is listed in the PJM interconnection queue as a 21.2 MW wind project in Lee County, IL. The filing names Shady Oaks as its point of interconnection. PJM lists its status as “Partially in Service - Under Construction”, with a target commercial operation date of December 7, 2027.

Queue IDAD2-134
Project nameShady Oaks Wind Power Project
Status (as published)Partially in Service - Under Construction
SubstationShady Oaks
Point of interconnectionShady Oaks
CountyLee
StateIL
VoltageNot reported
Capacity21.2 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Target commercial operation2027-12-07
Source datasetserial

Same substation and county

Shady Oaks substation: 2 requests in the PJM queue, 1 active totaling 21.2 MW.

Queue IDProjectMWResourceStatus
AG1-128Shady Oaks 138 kV51.8WindWithdrawn

Lee, IL: 106 requests in the PJM queue, 30 active totaling 2,565.3 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy105.9
MW capacity21.2
MFO215.4

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.