Substation Scout

Lower Crossing Wind

PJM queue ID AD2-047

Lower Crossing Wind (AD2-047) is listed in the PJM interconnection queue as a 34 MW wind project in Kankakee County, IL. The filing names Davis Creek as its point of interconnection. PJM lists its status as “Suspended”, with a target commercial operation date of November 30, 2026.

Queue IDAD2-047
Project nameLower Crossing Wind
Status (as published)Suspended
SubstationDavis Creek
Point of interconnectionDavis Creek 138 kV
CountyKankakee
StateIL
Voltage138 kV
Capacity34 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Target commercial operation2026-11-30
Source datasetserial

Same substation and county

Davis Creek substation: 15 requests in the PJM queue, 7 active totaling 725.4 MW.

Queue IDProjectMWResourceStatus
C01-1381Davis Creek 345 kV300BatteryActive
C01-1554Davis Creek 138kV 138 kV200BatteryActive
AF2-095Kankakee Solar86.4SolarEP
C01-1572Davis Creek 138kV 138 kV66WindActive
AD2-060Staley Solar20SolarEngineering and Procurement
AC2-154Staley Solar19SolarEngineering and Procurement
AB1-091Davis Creek 345kV550GasWithdrawn
AD2-175Davis Creek 345 kV123SolarWithdrawn
AH2-171Davis Creek 345 kV120SolarWithdrawn
AI1-148Davis Creek 138kV98.4SolarWithdrawn
AD1-112Davis Creek 138 kV34WindWithdrawn
AD2-148Davis Creek 345kV26.4WindWithdrawn

2 more on the substation page.

Kankakee, IL: 42 requests in the PJM queue, 15 active totaling 1,494.4 MW.

A substation with the same name is named in PJM transmission planning materials: Davis Creek (COMED, 3 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy200
MW capacity34
MFO200

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first