Staley Solar
PJM queue ID AC2-154
Staley Solar (AC2-154) is listed in the PJM interconnection queue as a 19 MW solar project in Kankakee County, IL. The filing names Davis Creek as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of September 30, 2027.
| Queue ID | AC2-154 |
|---|---|
| Project name | Staley Solar |
| Status (as published) | Engineering and Procurement |
| Substation | Davis Creek |
| Point of interconnection | Davis Creek 138kV |
| County | Kankakee |
| State | IL |
| Voltage | 138 kV |
| Capacity | 19 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2027-09-30 |
| Source dataset | serial |
Same substation and county
Davis Creek substation: 15 requests in the PJM queue, 7 active totaling 725.4 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| C01-1381 | Davis Creek 345 kV | 300 | Battery | Active |
| C01-1554 | Davis Creek 138kV 138 kV | 200 | Battery | Active |
| AF2-095 | Kankakee Solar | 86.4 | Solar | EP |
| C01-1572 | Davis Creek 138kV 138 kV | 66 | Wind | Active |
| AD2-047 | Lower Crossing Wind | 34 | Wind | Suspended |
| AD2-060 | Staley Solar | 20 | Solar | Engineering and Procurement |
| AB1-091 | Davis Creek 345kV | 550 | Gas | Withdrawn |
| AD2-175 | Davis Creek 345 kV | 123 | Solar | Withdrawn |
| AH2-171 | Davis Creek 345 kV | 120 | Solar | Withdrawn |
| AI1-148 | Davis Creek 138kV | 98.4 | Solar | Withdrawn |
| AD1-112 | Davis Creek 138 kV | 34 | Wind | Withdrawn |
| AD2-148 | Davis Creek 345kV | 26.4 | Wind | Withdrawn |
2 more on the substation page.
Kankakee, IL: 42 requests in the PJM queue, 15 active totaling 1,494.4 MW.
A substation with the same name is named in PJM transmission planning materials: Davis Creek (COMED, 3 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 50 |
| MW capacity | 19 |
| MFO | 50 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.