Big Sandy Peaker Plant

PJM queue ID AD2-001

Big Sandy Peaker Plant (AD2-001) is listed in the PJM interconnection queue as a 18 MW gas project in Wayne County, WV. The filing names Grangston as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of December 31, 2020.

Queue IDAD2-001
Project nameBig Sandy Peaker Plant
Status (as published)In Service
SubstationGrangston
Point of interconnectionGrangston 138 kV
CountyWayne
StateWV
Voltage138 kV
Capacity18 MW
Resource (as published)Natural Gas
Resource categoryGas (normalized for filtering)
Target commercial operation2020-12-31
Source datasetserial

Same substation and county

Grangston substation: 2 requests in the PJM queue, 2 active totaling 24 MW.

Queue IDProjectMWResourceStatus
N10Big Sandy Peaker Plant6GasIn Service

Wayne, WV: 3 requests in the PJM queue, 3 active totaling 1,069 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy18
MW capacity18
MFO318

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.