Ross County Solar
PJM queue ID AD1-073
Ross County Solar (AD1-073) is listed in the PJM interconnection queue as a 13.2 MW solar project in Ross County, OH. The filing names Buckskin as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of June 1, 2024.
| Queue ID | AD1-073 |
|---|---|
| Project name | Ross County Solar |
| Status (as published) | In Service |
| Substation | Buckskin |
| Point of interconnection | Buckskin 69 kV |
| County | Ross |
| State | OH |
| Voltage | 69 kV |
| Capacity | 13.2 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2024-06-01 |
| Source dataset | serial |
Same substation and county
Buckskin substation: 10 requests in the PJM queue, 2 active totaling 77.2 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AC2-060 | Ross County Solar | 64 | Solar | In Service |
| AC1-160 | Buckskin 69kV | 100 | Solar | Withdrawn |
| AD2-017 | Buckskin 69 kV | 65.6 | Solar | Withdrawn |
| AC2-087 | Buckskin 69kV | 47.4 | Solar | Withdrawn |
| AC1-149 | Buckskin 69kV | 32.3 | Solar | Withdrawn |
| AC2-055 | Buckskin 69kV | 18.1 | Solar | Withdrawn |
| AI2-251 | Buckskin 69kV | 10 | Solar | Withdrawn |
| W3-170 | Buckskin 69kV | 0 | Solar | Withdrawn |
| W4-036 | Ohio Solar I | 0 | Solar | Withdrawn |
Ross, OH: 24 requests in the PJM queue, 8 active totaling 457.9 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 20 |
| MW capacity | 13.2 |
| MFO | 120 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.