Ross County Solar

PJM queue ID AC2-060

Ross County Solar (AC2-060) is listed in the PJM interconnection queue as a 64 MW solar project in Ross County, OH. The filing names Buckskin as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of June 1, 2024.

Queue IDAC2-060
Project nameRoss County Solar
Status (as published)In Service
SubstationBuckskin
Point of interconnectionBuckskin 69kV
CountyRoss
StateOH
Voltage69 kV
Capacity64 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2024-06-01
Source datasetserial

Same substation and county

Buckskin substation: 10 requests in the PJM queue, 2 active totaling 77.2 MW.

Queue IDProjectMWResourceStatus
AD1-073Ross County Solar13.2SolarIn Service
AC1-160Buckskin 69kV100SolarWithdrawn
AD2-017Buckskin 69 kV65.6SolarWithdrawn
AC2-087Buckskin 69kV47.4SolarWithdrawn
AC1-149Buckskin 69kV32.3SolarWithdrawn
AC2-055Buckskin 69kV18.1SolarWithdrawn
AI2-251Buckskin 69kV10SolarWithdrawn
W3-170Buckskin 69kV0SolarWithdrawn
W4-036Ohio Solar I0SolarWithdrawn

Ross, OH: 24 requests in the PJM queue, 8 active totaling 457.9 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy100
MW capacity64
MFO100

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.