Yellowbud Solar
PJM queue ID AC2-059
Yellowbud Solar (AC2-059) is listed in the PJM interconnection queue as a 62.5 MW solar project in Ross County, OH. The filing names Biers Run-Circleville as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of December 15, 2022.
| Queue ID | AC2-059 |
|---|---|
| Project name | Yellowbud Solar |
| Status (as published) | In Service |
| Substation | Biers Run-Circleville |
| Point of interconnection | Biers Run-Circleville 138kV |
| County | Ross |
| State | OH |
| Voltage | 138 kV |
| Capacity | 62.5 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2022-12-15 |
| Source dataset | serial |
Same substation and county
Biers Run-Circleville substation: 6 requests in the PJM queue, 3 active totaling 138.7 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AD2-016 | Yellowbud Solar | 62.5 | Solar | In Service |
| AD1-072 | Yellowbud Solar | 13.7 | Solar | In Service |
| AD2-162 | Scioto Farms Solar Project | 73.8 | Solar | Withdrawn |
| AI2-249 | Biers Run-Circleville 138 kV | 40 | Solar | Withdrawn |
| AE2-327 | Biers Run-Circleville 138 kV | 31.3 | Battery | Withdrawn |
Ross, OH: 24 requests in the PJM queue, 8 active totaling 457.9 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 127 |
| MW capacity | 62.5 |
| MFO | 127 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.