Pitt Solar
PJM queue ID AC1-189
Pitt Solar (AC1-189) is listed in the PJM interconnection queue as a 53.4 MW solar project in Pitt County, NC. The filing names Chinquapin-Everetts as its point of interconnection. PJM lists its status as “Under Construction”, with a target commercial operation date of November 17, 2026.
| Queue ID | AC1-189 |
|---|---|
| Project name | Pitt Solar |
| Status (as published) | Under Construction |
| Substation | Chinquapin-Everetts |
| Point of interconnection | Chinquapin-Everetts 230kV |
| County | Pitt |
| State | NC |
| Voltage | 230 kV |
| Capacity | 53.4 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2026-11-17 |
| Source dataset | serial |
Same substation and county
Chinquapin-Everetts substation: 3 requests in the PJM queue, 1 active totaling 53.4 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AF2-080 | Brookfield Pitt Solar | 48.5 | Solar | Withdrawn |
| AH2-385 | Chinquapin-Everetts 230kV | 0 | Battery | Withdrawn |
Pitt, NC: 6 requests in the PJM queue, 1 active totaling 53.4 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 80 |
| MW capacity | 53.4 |
| MFO | 80 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.