Chinquapin-Everetts substation interconnection queue

1 active project totalling 53.4 MW in the PJM queue, plus 2 with terminal status (shown greyed).

1active projects
53.4active MW
3total filed
Queue IDProjectkVMWResourceStatus
AC1-189 Pitt Solar 230 53.4 Solar Under Construction
AF2-080 Brookfield Pitt Solar 230 48.5 Solar Withdrawn
AH2-385 Chinquapin-Everetts 230kV 230 0 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.