Chinquapin-Everetts substation interconnection queue
1 active project totaling 53.4 MW in the PJM queue, plus 2 with terminal status (shown grayed).
3 PJM queue filings name Chinquapin-Everetts as the point of interconnection, all in Pitt County, NC.
Target commercial operation dates as filed run from Jun 2022 to Dec 2026 (3 filings).
Transmission owner as filed: Dominion (1 filing).
1active projects
53.4active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AC1-189 | Pitt Solar | 230 | 53.4 | Solar | Under Construction | Nov 2026 |
| AF2-080 | Brookfield Pitt Solar | 230 | 48.5 | Solar | Withdrawn | Jun 2022 |
| AH2-385 | Chinquapin-Everetts 230kV | 230 | 0 | Battery | Withdrawn | Dec 2026 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Pitt County, NC
No other substation in Pitt County, NC is named as a point of interconnection in the PJM queue.