Pitt, NC interconnection queue
1 active project
totaling 53.4 MW in the PJM queue, plus 5 with terminal status (shown grayed).
1 active projects
53.4 active MW
6 total filed
Queue ID Project kV MW Resource Status
C01-1918
Shiloh DP - Conetoe Tap 115 kV
115
179
Solar
Withdrawn
AC1-189
Pitt Solar
230
53.4
Solar
Under Construction
AF2-080
Brookfield Pitt Solar
230
48.5
Solar
Withdrawn
AD2-068
Everetts-Greenville 230kV
230
33
Solar
Withdrawn
AB2-035
Bethel-Carolina 12.5kV
12.5
2.1
Solar
Withdrawn
AH2-385
Chinquapin-Everetts 230kV
230
0
Battery
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with PJM before relying on these figures.
Site Scanner draws on HIFLD substations and electric retail service
territories, newer substations HIFLD lacks from OpenStreetMap, EIA gas transmission pipelines, HIFLD gas facilities and gas
utility territories, USGS watershed boundaries, FEMA flood hazard layers and US Census
geocoding. Queue data is compiled from public interconnection
queue filings. Every figure carries its source and retrieval date.
A withdrawal records that a request left the queue. It says
nothing about injection capacity at that location. Verify with the relevant ISO before
relying on any figure. Queue datasets are tracked separately and are
not directly comparable: status vocabularies, fuel coding, and publication
cadence all differ.
Screening aid only. Not a system impact study. Contiguous US.