Substation Scout

Pitt, NC interconnection queue

2 active projects totalling 232.4 MW in the PJM queue, plus 4 with terminal status (shown greyed).

2active projects
232.4active MW
6total filed
Queue IDProjectkVMWResourceStatus
C01-1918 Shiloh DP - Conetoe Tap 115 kV 115 179 Solar Active
AC1-189 Pitt Solar 230 53.4 Solar Under Construction
AF2-080 Brookfield Pitt Solar 230 48.5 Solar Withdrawn
AD2-068 Everetts-Greenville 230kV 230 33 Solar Withdrawn
AB2-035 Bethel-Carolina 12.5kV 12.5 2.1 Solar Withdrawn
AH2-385 Chinquapin-Everetts 230kV 230 0 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.