Great Bend
PJM queue ID AC1-082
Great Bend (AC1-082) is listed in the PJM interconnection queue as a 29 MW solar project in Meigs County, OH. The filing names Ravenswood-Hemlock as its point of interconnection. PJM lists its status as “Partially in Service - Under Construction”, with a target commercial operation date of October 31, 2025.
| Queue ID | AC1-082 |
|---|---|
| Project name | Great Bend |
| Status (as published) | Partially in Service - Under Construction |
| Substation | Ravenswood-Hemlock |
| Point of interconnection | Ravenswood-Hemlock 69kV |
| County | Meigs |
| State | OH |
| Voltage | 69 kV |
| Capacity | 29 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2025-10-31 |
| Source dataset | serial |
Same substation and county
Ravenswood-Hemlock substation: 2 requests in the PJM queue, 1 active totaling 29 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AI2-313 | Ravenswood-Hemlock 69kV | 17.1 | Solar | Withdrawn |
Meigs, OH: 11 requests in the PJM queue, 2 active totaling 639 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 48 |
| MW capacity | 29 |
| MFO | 48 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.