Susquehanna #1

PJM queue ID A08

Susquehanna #1 (A08) is listed in the PJM interconnection queue as a 15 MW nuclear project in Columbia County, PA. The filing names Susquehanna as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of July 1, 2002.

Queue IDA08
Project nameSusquehanna #1
Status (as published)In Service
SubstationSusquehanna
Point of interconnectionSusquehanna 230 kV
CountyColumbia
StatePA
Voltage230 kV
Capacity15 MW
Resource (as published)Nuclear
Resource categoryNuclear (normalized for filtering)
Target commercial operation2002-07-01
Source datasetserial

Same substation and county

Susquehanna substation: 13 requests in the PJM queue, 4 active totaling 68 MW.

Queue IDProjectMWResourceStatus
A09Susquehanna #135NuclearIn Service
H02Susquehanna #19NuclearIn Service
H03Susquehanna #29NuclearIn Service
R94Susquehanna940CoalWithdrawn
R95Susquehanna940CoalWithdrawn
R01Susquehanna800NuclearWithdrawn
R02Susquehanna800NuclearWithdrawn
U4-005Susquehanna640GasWithdrawn
B42Susquehanna 230kV500GasWithdrawn
H01Susquehanna 500kV2NuclearWithdrawn
X3-056Susquehanna 230kV0NuclearWithdrawn
X3-057Susquehanna 230kV0NuclearWithdrawn

Columbia, PA: 35 requests in the PJM queue, 10 active totaling 135.3 MW.

A substation with the same name is named in PJM transmission planning materials: Susquehanna (PPL, 25 mentions).

Same name and state (weaker). Matched on name and state: the utility that presented this substation operates in one state, and every queue filing at a substation of the same name is in that state. No transmission owner is recorded on those filings, so this is a weaker match than one on owner. Not verified as the same facility.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy15
MW capacity15
MFO1140

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.