Sunridge Solar

PJM queue ID AE2-029

Sunridge Solar (AE2-029) is listed in the PJM interconnection queue as a 30 MW solar project in Rockingham County, VA. The filing names Grottoes-Merck as its point of interconnection. PJM lists its status as “Partially in Service - Under Construction”, with a target commercial operation date of November 1, 2026.

Queue IDAE2-029
Project nameSunridge Solar
Status (as published)Partially in Service - Under Construction
SubstationGrottoes-Merck
Point of interconnectionGrottoes-Merck 115kV
CountyRockingham
StateVA
Voltage115 kV
Capacity30 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2026-11-01
Source datasetserial

Same substation and county

Rockingham, VA: 26 requests in the PJM queue, 4 active totaling 235 MW.

Tracked changes

1 change observed between weekly snapshots of the PJM queue since PJM tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-09-14 Status change n/a Under Construction → Partially in Service - Under Construction

Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy50
MW capacity30
MFO50

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first