Buckeye Plains II Solar
PJM queue ID AC1-165
Buckeye Plains II Solar (AC1-165) is listed in the PJM interconnection queue as a 33.6 MW solar project in Pickaway County, OH. The filing names Atlanta III as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of January 7, 2025.
| Queue ID | AC1-165 |
|---|---|
| Project name | Buckeye Plains II Solar |
| Status (as published) | In Service |
| Substation | Atlanta III |
| Point of interconnection | Atlanta 69kV III |
| County | Pickaway |
| State | OH |
| Voltage | 69 kV |
| Capacity | 33.6 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2025-01-07 |
| Source dataset | serial |
Same substation and county
Pickaway, OH: 35 requests in the PJM queue, 9 active totaling 196.9 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 49.9 |
| MW capacity | 33.6 |
| MFO | 99.8 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.