Substation Scout

Blossom Solar

PJM queue ID AG1-039

Blossom Solar (AG1-039) is listed in the PJM interconnection queue as a 23.5 MW solar project in Morrow County, OH. The filing names Galion II as its point of interconnection. PJM lists its status as “Under Construction”, with a target commercial operation date of July 31, 2027.

Queue IDAG1-039
Project nameBlossom Solar
Status (as published)Under Construction
SubstationGalion II
Point of interconnectionGalion 138 kV II
CountyMorrow
StateOH
Voltage138 kV
Capacity23.5 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2027-07-31
Source datasetserial

Same substation and county

Morrow, OH: 20 requests in the PJM queue, 6 active totaling 938.9 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy56
MW capacity23.52
MFO144

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first