Dart Container (W1-054) is listed in the PJM interconnection queue as a 11.4 MW gas project in Lancaster County, PA. The filing names South Akron-Prince as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of December 31, 2011.

Queue IDW1-054
Project nameDart Container
Status (as published)In Service
SubstationSouth Akron-Prince
Point of interconnectionSouth Akron-Prince
CountyLancaster
StatePA
VoltageNot reported
Capacity11.4 MW
Resource (as published)Methane
Resource categoryGas (normalized for filtering)
Target commercial operation2011-12-31
Source datasetserial

Same substation and county

Lancaster, PA: 41 requests in the PJM queue, 8 active totaling 265.5 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy11.4
MW capacity11.4
MFO11.4

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first