Hampshire, WV interconnection queue
3 active projects totalling 68.8 MW in the PJM queue, plus 3 with terminal status (shown greyed).
3active projects
68.8active MW
6total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AH1-458 | Hampshire - Ridgeley 138 kV 1 | 138 | 60 | Solar | Withdrawn |
| AH1-459 | Hampshire - Ridgeley 138 kV 2 | 138 | 50 | Battery | Withdrawn |
| AD2-157 | Hampshire-Gore 138kV | 138 | 42 | Solar | Withdrawn |
| C01-1237 | Meadow Brook - Greenland Gap 500 kV | 500 | 38 | Wind | Active |
| AH1-387 | CPV Capon Springs Wind | 500 | 22.1 | Wind | Active |
| AE1-109 | Capon Bridge Solar | 34 | 8.7 | Solar | In Service |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.