Hampshire, WV interconnection queue
3 active projects
totaling 68.8 MW in the PJM queue, plus 3 with terminal status (shown grayed).
3 active projects
68.8 active MW
6 total filed
Queue ID Project kV MW Resource Status
AH1-458
Hampshire - Ridgeley 138 kV 1
138
60
Solar
Withdrawn
AH1-459
Hampshire - Ridgeley 138 kV 2
138
50
Battery
Withdrawn
AD2-157
Hampshire-Gore 138kV
138
42
Solar
Withdrawn
C01-1237
Meadow Brook - Greenland Gap 500 kV
500
38
Wind
Active
AH1-387
CPV Capon Springs Wind
500
22.1
Wind
Active
AE1-109
Capon Bridge Solar
34
8.7
Solar
In Service
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with PJM before relying on these figures.
Site Scanner draws on HIFLD substations and electric retail service
territories, newer substations HIFLD lacks from OpenStreetMap, EIA gas transmission pipelines, HIFLD gas facilities and gas
utility territories, USGS watershed boundaries, FEMA flood hazard layers and US Census
geocoding. Queue data is compiled from public interconnection
queue filings. Every figure carries its source and retrieval date.
A withdrawal records that a request left the queue. It says
nothing about injection capacity at that location. Verify with the relevant ISO before
relying on any figure. Queue datasets are tracked separately and are
not directly comparable: status vocabularies, fuel coding, and publication
cadence all differ.
Screening aid only. Not a system impact study. Contiguous US.