CPV Capon Springs Wind
PJM queue ID AH1-387
CPV Capon Springs Wind (AH1-387) is listed in the PJM interconnection queue as a 22.1 MW wind project in Hampshire County, WV. The filing names Meadowbrook-Greenland Gap as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of August 1, 2028.
| Queue ID | AH1-387 |
|---|---|
| Project name | CPV Capon Springs Wind |
| Status (as published) | Active |
| Substation | Meadowbrook-Greenland Gap |
| Point of interconnection | Meadowbrook-Greenland Gap 500kV |
| County | Hampshire |
| State | WV |
| Voltage | 500 kV |
| Capacity | 22.1 MW |
| Resource (as published) | Wind |
| Resource category | Wind (normalized for filtering) |
| Target commercial operation | 2028-08-01 |
| Source dataset | cycle |
Same substation and county
Hampshire, WV: 6 requests in the PJM queue, 3 active totaling 68.8 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | CPV Springs Wind, LLC |
|---|---|
| Transmission owner | APS |
| Project type | Generation Interconnection |
| Cycle | TC2 |
| Stage | Phase 3 |
| MW energy | 150.0 |
| MW capacity | 22.05 |
| MFO | 150.0 |
| Submitted date | 9/10/2021 |
| Last updated | 8/27/2026 |