Meadow Brook - Greenland Gap 500 kV
PJM queue ID C01-1237
Meadow Brook - Greenland Gap 500 kV (C01-1237) is listed in the PJM interconnection queue as a 38 MW wind project in Hampshire County, WV. The filing names Meadow Brook - Greenland Gap as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of August 1, 2028.
| Queue ID | C01-1237 |
|---|---|
| Project name | Meadow Brook - Greenland Gap 500 kV |
| Status (as published) | Active |
| Substation | Meadow Brook - Greenland Gap |
| Point of interconnection | Meadow Brook - Greenland Gap 500 kV |
| County | Hampshire |
| State | WV |
| Voltage | 500 kV |
| Capacity | 38 MW |
| Resource (as published) | Wind |
| Resource category | Wind (normalized for filtering) |
| Target commercial operation | 2028-08-01 |
| Source dataset | cycle |
Same substation and county
Hampshire, WV: 6 requests in the PJM queue, 3 active totaling 68.8 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | CPV Springs Wind, LLC |
|---|---|
| Transmission owner | APS |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 0.0 |
| MW capacity | 37.95 |
| MFO | 150.0 |
| Submitted date | 4/27/2026 |
| Last updated | 5/26/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.