Nutall - Quinwood 138 kV
PJM queue ID C01-1230
Nutall - Quinwood 138 kV (C01-1230) is listed in the PJM interconnection queue as a 45 MW solar project in Greenbrier County, WV. The filing names Nutall - Quinwood as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of November 1, 2030.
| Queue ID | C01-1230 |
|---|---|
| Project name | Nutall - Quinwood 138 kV |
| Status (as published) | Active |
| Substation | Nutall - Quinwood |
| Point of interconnection | Nutall - Quinwood 138 kV |
| County | Greenbrier |
| State | WV |
| Voltage | 138 kV |
| Capacity | 45 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2030-11-01 |
| Source dataset | cycle |
Same substation and county
Greenbrier, WV: 11 requests in the PJM queue, 4 active totaling 89.5 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Greenbrier Solar LLC |
|---|---|
| Transmission owner | AEP |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 75.0 |
| MW capacity | 45.0 |
| MFO | 75.0 |
| Submitted date | 4/24/2026 |
| Last updated | 6/8/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.