Waypost Solar Project

PJM queue ID AB2-036

Waypost Solar Project (AB2-036) is listed in the PJM interconnection queue as a 34.9 MW solar project in Caroline County, MD. The filing names Church - Oil City as its point of interconnection. PJM lists its status as “Suspended”, with a target commercial operation date of December 31, 2026.

Queue IDAB2-036
Project nameWaypost Solar Project
Status (as published)Suspended
SubstationChurch - Oil City
Point of interconnectionChurch - Oil City 138kV
CountyCaroline
StateMD
Voltage138 kV
Capacity34.9 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2026-12-31
Source datasetserial

Same substation and county

Caroline, MD: 18 requests in the PJM queue, 3 active totaling 490 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy92
MW capacity34.9
MFO92

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.