AB2-037 - Steele 230 kV
PJM queue ID C01-1772
AB2-037 - Steele 230 kV (C01-1772) is listed in the PJM interconnection queue as a 400 MW battery project in Caroline County, MD. The filing names AB2-037 - Steele as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of September 30, 2030.
| Queue ID | C01-1772 |
|---|---|
| Project name | AB2-037 - Steele 230 kV |
| Status (as published) | Active |
| Substation | AB2-037 - Steele |
| Point of interconnection | AB2-037 - Steele 230 kV |
| County | Caroline |
| State | MD |
| Voltage | 230 kV |
| Capacity | 400 MW |
| Resource (as published) | Storage |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2030-09-30 |
| Source dataset | cycle |
Same substation and county
Caroline, MD: 18 requests in the PJM queue, 3 active totaling 490 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | ENGIE IR Holdings LLC |
|---|---|
| Transmission owner | DPL |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 400.0 |
| MW capacity | 400.0 |
| MFO | 400.0 |
| Submitted date | 4/25/2026 |
| Last updated | 6/4/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.