9 active projects totaling 1,705 MW in the MISO queue, plus 7 with terminal status (shown grayed).

9active projects
1,705active MW
16total filed
Queue IDProjectkVMWResourceStatus
J4022 Not reported n/r 1,509 Gas Withdrawn
J2704 Not reported n/r 500 Solar Active
J2708 Not reported n/r 500 Solar Active
J2317 Not reported 115 225 Solar Active
J1239 Not reported 115 100 Solar Active
J1883 Not reported 115 100 Solar Withdrawn
J2816 Not reported 115 100 Solar Active
J4140 Not reported n/r 100 Battery Active
J852 Not reported 115 100 Solar Withdrawn
J4156 Not reported 115 93 Solar Withdrawn
J2735 Not reported 69 80 Solar Withdrawn
J2917 Not reported n/r 80 Solar Active
J4049 Not reported n/r 75 Solar Active
J616 Not reported n/r 50 Solar Withdrawn
J673 Not reported n/r 50 Solar Withdrawn
J1602 Not reported 115 25 Battery Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first