MISO request J2317
MISO queue ID J2317
Queue request J2317 was listed in the MISO interconnection queue at the end of 2025 as a 225 MW solar project in Ouachita Parish, LA, according to Berkeley Lab’s queue data file. The filing names BASTROP (CAHOON) - STERLINGTON 115 SWYD as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 1, 2027.
| Queue ID | J2317 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | BASTROP (CAHOON) - STERLINGTON 115 SWYD |
| Point of interconnection | BASTROP (CAHOON) - STERLINGTON 115 SWYD 115.0kV |
| County | Ouachita Parish |
| State | LA |
| Voltage | 115 kV |
| Capacity | 225 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Proposed online date | 2027-12-01 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Ouachita Parish, LA: 16 requests in the MISO queue, 9 active totaling 1,705 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | ENTERGY LOUISIANA |
|---|---|
| Cluster | DPP-2021 South |
| Interconnection service | NRIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | IA Pending |
| Study phase (as the queue printed it) | Study Phase: GIA In Process; Post GIA Status: Not Started |
| Queue date | 2021-12-21 |
| Interconnection agreement date | 2025-12-09 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.