MISO request J4140
MISO queue ID J4140
Queue request J4140 was listed in the MISO interconnection queue at the end of 2025 as a 100 MW battery project in Ouachita Parish, LA, according to Berkeley Lab’s queue data file. The filing names Cotton as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of May 31, 2030.
| Queue ID | J4140 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Cotton |
| Point of interconnection | Cotton |
| County | Ouachita Parish |
| State | LA |
| Voltage | Not reported |
| Capacity | 100 MW |
| Resource (as published) | Battery |
| Resource category | Battery (normalized for filtering) |
| Proposed online date | 2030-05-31 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Ouachita Parish, LA: 16 requests in the MISO queue, 9 active totaling 1,705 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | ENTERGY LOUISIANA |
|---|---|
| Cluster | DPP Cycle Pending South |
| Interconnection service | NRIS |
| Project type | Generation |
| Queue date | 2025-09-25 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.