Queue request J2704 was listed in the MISO interconnection queue at the end of 2025 as a 500 MW solar project in Ouachita Parish, LA, according to Berkeley Lab’s queue data file. The filing names Cargas as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of April 15, 2027.

Queue IDJ2704
Project nameNot reported
Status (as published)Active
SubstationCargas
Point of interconnectionCargas
CountyOuachita Parish
StateLA
VoltageNot reported
Capacity500 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2027-04-15
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Cargas substation: 2 requests in the MISO queue, 2 active totaling 1,000 MW.

Queue IDProjectMWResourceStatus
J2708Not reported500SolarActive

Ouachita Parish, LA: 16 requests in the MISO queue, 9 active totaling 1,705 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityENTERGY LOUISIANA
ClusterDPP-2022 South
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Cluster Study
Study phase (as the queue printed it)Study Phase: DPP 2; Post GIA Status: Not Started
Queue date2022-09-14

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first