MISO request J1602
MISO queue ID J1602
Queue request J1602 was listed in the MISO interconnection queue at the end of 2025 as a 25 MW battery project in Ouachita Parish, LA, according to Berkeley Lab’s queue data file. The filing names Rilla substation (Same as J1239) as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of October 15, 2024.
| Queue ID | J1602 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Rilla substation (Same as J1239) |
| Point of interconnection | Rilla 115kV substation (Same as J1239) |
| County | Ouachita Parish |
| State | LA |
| Voltage | 115 kV |
| Capacity | 25 MW |
| Resource (as published) | Battery |
| Resource category | Battery (normalized for filtering) |
| Proposed online date | 2024-10-15 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Ouachita Parish, LA: 16 requests in the MISO queue, 9 active totaling 1,705 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | ENTERGY LOUISIANA |
|---|---|
| Cluster | DPP-2020 South |
| Interconnection service | NRIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | IA Executed |
| Study phase (as the queue printed it) | Study Phase: GIA In Process; Post GIA Status: Not Started |
| Queue date | 2021-11-02 |
| Interconnection agreement date | 2023-01-18 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.