Otter Tail, MN interconnection queue
7 active projects totaling 849.6 MW in the MISO queue, plus 7 with terminal status (shown grayed).
7active projects
849.6active MW
14total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| R1006 | Replace 350 MW of ALTW.FPL_DAEC Unit with Solar; Duane Arnold | 115 | 350 | Hybrid | Withdrawn |
| J4091 | Not reported | 345 | 295 | Solar | Active |
| J4129 | Not reported | 345 | 200 | Wind | Active |
| G721 | Not reported | 345 | 160 | Wind | Withdrawn |
| J3742 | Not reported | 230 | 160 | Hybrid | Active |
| G843 | Not reported | 115 | 100 | Wind | Withdrawn |
| J3778 | Not reported | n/r | 100 | Battery | Withdrawn |
| E0005 | Hoot Lake Battery Energy Storage System | 115 | 90.7 | Battery | Active |
| G619 | Not reported | 41 | 50 | Wind | Operational |
| J193 | Not reported | 115 | 50 | Wind | Withdrawn |
| R1001 | Replace Hoot Lake units 2 and 3 (144.8 MW) with Seventeen (17) Sungrow 3 MW solar inverters and PV panels at 49.9 MW; Hoot Lake 2 & 3 | 115 | 49.9 | Hybrid | Active |
| G697 | Not reported | 115 | 21 | Wind | Withdrawn |
| G146 | Not reported | n/r | 4 | Other | Operational |
| G729 | Not reported | 41.6 | 2.5 | Wind | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.