Substation Scout

Otter Tail, MN interconnection queue

7 active projects totaling 849.6 MW in the MISO queue, plus 7 with terminal status (shown grayed).

7active projects
849.6active MW
14total filed
Queue IDProjectkVMWResourceStatus
R1006 Replace 350 MW of ALTW.FPL_DAEC Unit with Solar; Duane Arnold 115 350 Hybrid Withdrawn
J4091 Not reported 345 295 Solar Active
J4129 Not reported 345 200 Wind Active
G721 Not reported 345 160 Wind Withdrawn
J3742 Not reported 230 160 Hybrid Active
G843 Not reported 115 100 Wind Withdrawn
J3778 Not reported n/r 100 Battery Withdrawn
E0005 Hoot Lake Battery Energy Storage System 115 90.7 Battery Active
G619 Not reported 41 50 Wind Operational
J193 Not reported 115 50 Wind Withdrawn
R1001 Replace Hoot Lake units 2 and 3 (144.8 MW) with Seventeen (17) Sungrow 3 MW solar inverters and PV panels at 49.9 MW; Hoot Lake 2 & 3 115 49.9 Hybrid Active
G697 Not reported 115 21 Wind Withdrawn
G146 Not reported n/r 4 Other Operational
G729 Not reported 41.6 2.5 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.