Replace Hoot Lake units 2 and 3 (144.8 MW) with Seventeen (17) Sungrow 3 MW solar inverters and PV panels at 49.9 MW; Hoot Lake 2 & 3

MISO queue ID R1001

Replace Hoot Lake units 2 and 3 (144.8 MW) with Seventeen (17) Sungrow 3 MW solar inverters and PV panels at 49.9 MW; Hoot Lake 2 & 3 (R1001) was listed in the MISO interconnection queue at the end of 2025 as a 49.9 MW hybrid project in Otter Tail County, MN, according to Berkeley Lab’s queue data file. The filing names Hoot Lake as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of April 15, 2022.

Queue IDR1001
Project nameReplace Hoot Lake units 2 and 3 (144.8 MW) with Seventeen (17) Sungrow 3 MW solar inverters and PV panels at 49.9 MW; Hoot Lake 2 & 3
Status (as published)Active
SubstationHoot Lake
Point of interconnectionHoot Lake 115KV
CountyOtter Tail
StateMN
Voltage115 kV
Capacity49.9 MW
Resource (as published)Solar+Other
Resource categoryHybrid (normalized for filtering)
Proposed online date2022-04-15
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Hoot Lake substation: 2 requests in the MISO queue, 1 active totaling 49.9 MW.

Queue IDProjectMWResourceStatus
R1006Replace 350 MW of ALTW.FPL_DAEC Unit with Solar; Duane Arnold350HybridWithdrawn

Otter Tail, MN: 14 requests in the MISO queue, 7 active totaling 849.6 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityOTTER TAIL POWER COMPANY
Interconnection serviceNRIS
Project typeGeneration
Queue date2020-05-15
Operational date2023-08-08
Components (hybrid)Solar 49.9 MW + Other

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first