Queue request J3742 was listed in the MISO interconnection queue at the end of 2025 as a 160 MW hybrid project in Otter Tail County, MN, according to Berkeley Lab’s queue data file. The filing names Wahpeton - Fergus Falls as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 15, 2028.

Queue IDJ3742
Project nameNot reported
Status (as published)Active
SubstationWahpeton - Fergus Falls
Point of interconnectionWahpeton - Fergus Falls 230.0kV
CountyOtter Tail
StateMN
Voltage230 kV
Capacity160 MW
Resource (as published)Solar+Battery
Resource categoryHybrid (normalized for filtering)
Proposed online date2028-12-15
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Otter Tail, MN: 14 requests in the MISO queue, 7 active totaling 849.6 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityOTTER TAIL POWER COMPANY
ClusterDPP-2023 West
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)In Progress (unknown study)
Study phase (as the queue printed it)Study Phase: DPP 1
Queue date2024-06-06
Components (hybrid)Solar 160 MW + Battery

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.