MISO queue ID J4091

Queue request J4091 was listed in the MISO interconnection queue at the end of 2025 as a 295 MW solar project in Otter Tail County, MN, according to Berkeley Lab’s queue data file. The filing names ALEXANDRIA - BISON as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of June 30, 2030.

Queue IDJ4091
Project nameNot reported
Status (as published)Active
SubstationALEXANDRIA - BISON
Point of interconnectionALEXANDRIA - BISON 345.0kV
CountyOtter Tail
StateMN
Voltage345 kV
Capacity295 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2030-06-30
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

ALEXANDRIA - BISON substation: 5 requests in the MISO queue, 5 active totaling 1,415 MW.

Queue IDProjectMWResourceStatus
J3762Not reported430SolarActive
J4147Not reported245SolarActive
J4148Not reported245SolarActive
J4129Not reported200WindActive

Otter Tail, MN: 14 requests in the MISO queue, 7 active totaling 849.6 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityOTTER TAIL POWER COMPANY
ClusterDPP Cycle Pending West
Interconnection serviceNRIS
Project typeGeneration
Queue date2025-10-06

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first