Deuel, SD interconnection queue

6 active projects totaling 2,320.7 MW in the MISO queue, plus 17 with terminal status (shown grayed).

6active projects
2,320.7active MW
23total filed
Queue IDProjectkVMWResourceStatus
J3941 Not reported 345 1,144 Gas Active
J4032 Not reported 345 442 Gas Withdrawn
J526 Not reported 345 300 Wind Operational
J597 Not reported n/r 300 Wind Withdrawn
J510 Not reported n/r 284.5 Gas Operational
G804 Not reported 230 250 Wind Withdrawn
J1485 Not reported 345 250 Wind Active
J3862 Not reported 345 250 Solar Withdrawn
J638 Not reported 345 204 Wind Withdrawn
J442 Not reported 230 200 Wind Operational
J629 Not reported n/r 200 Wind Withdrawn
J630 Not reported n/r 200 Wind Withdrawn
J747 Not reported 345 200 Wind Withdrawn
J2546 Not reported 345 185 Wind Withdrawn
G154 Not reported n/r 150 Wind Withdrawn
G803 Not reported 115 150 Wind Withdrawn
J2003 Not reported 345 150 Solar Withdrawn
J3400 Not reported 345 142.2 Other Active
G635 Not reported n/r 101 Wind Withdrawn
J637 Not reported 345 98 Wind Withdrawn
G404 Not reported n/r 80 Other Withdrawn
J2005 Not reported 345 75 Battery Withdrawn
J055 Not reported n/r 40 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first