Substation Scout

MISO request J3941

MISO queue ID J3941

Queue request J3941 was listed in the MISO interconnection queue at the end of 2025 as a 1,144 MW gas project in Deuel County, SD, according to Berkeley Lab’s queue data file. The filing names Astoria substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of May 1, 2030.

Queue IDJ3941
Project nameNot reported
Status (as published)Active
SubstationAstoria substation
Point of interconnectionAstoria 345kV substation
CountyDeuel
StateSD
Voltage345 kV
Capacity1,144 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2030-05-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Astoria substation substation: 2 requests in the MISO queue, 2 active totaling 1,286.2 MW.

Queue IDProjectMWResourceStatus
J3400Not reported142.2OtherActive

Deuel, SD: 23 requests in the MISO queue, 6 active totaling 2,320.7 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityOTTER TAIL POWER COMPANY
ClusterDPP Cycle Pending West
Interconnection serviceNRIS
Project typeGeneration
Queue date2025-03-26

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first