MISO request J3400

MISO queue ID J3400

Queue request J3400 was listed in the MISO interconnection queue at the end of 2025 as a 142.2 MW project in Deuel County, SD, according to Berkeley Lab’s queue data file. The filing names Astoria substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of April 19, 2028.

Queue IDJ3400
Project nameNot reported
Status (as published)Active
SubstationAstoria substation
Point of interconnectionAstoria 345kV substation
CountyDeuel
StateSD
Voltage345 kV
Capacity142.2 MW
Resource (as published)Other
Resource categoryOther (normalized for filtering)
Proposed online date2028-04-19
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Astoria substation substation: 2 requests in the MISO queue, 2 active totaling 1,286.2 MW.

Queue IDProjectMWResourceStatus
J3941Not reported1,144GasActive

Deuel, SD: 23 requests in the MISO queue, 6 active totaling 2,320.7 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityOTTER TAIL POWER COMPANY
ClusterDPP-2023 West
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)In Progress (unknown study)
Study phase (as the queue printed it)Study Phase: DPP 1
Queue date2024-03-20

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.