MISO request J442

MISO queue ID J442

Queue request J442 was listed in the MISO interconnection queue at the end of 2025 as a 200 MW wind project in Deuel County, SD, according to Berkeley Lab’s queue data file. The filing names Big Stone substation via a radial line as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of October 1, 2019.

Queue IDJ442
Project nameNot reported
Status (as published)Operational
SubstationBig Stone substation via a radial line
Point of interconnectionBig Stone substation via a radial 230 kV line
CountyDeuel
StateSD
Voltage230 kV
Capacity200 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2019-10-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Deuel, SD: 23 requests in the MISO queue, 6 active totaling 2,320.7 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

ClusterDPP-2015-AUG West
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)DPP - SIS
Queue date2015-04-15
Interconnection agreement date2017-08-11
Operational date2019-10-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.