Substation Scout

Branch, MI interconnection queue

13 active projects totaling 3,125 MW in the MISO queue, plus 4 with terminal status (shown grayed).

13active projects
3,125active MW
17total filed
Queue IDProjectkVMWResourceStatus
J3922 Not reported n/r 1,445 Gas Active
J1550 Not reported 138 200 Solar Active
J3859 Not reported n/r 200 Solar Active
J4123 Not reported n/r 200 Battery Active
J1195 Not reported 138 150.4 Wind Withdrawn
J1320 Not reported 138 150 Solar Active
J1401 Not reported 138 150 Solar Operational
J3471 Not reported 138 150 Solar Active
S1062 Surplus; J1320 138 150 Hybrid Active
J1635 Not reported 138 100 Battery Active
J1916 Not reported n/r 100 Solar Active
J3861 Not reported n/r 100 Battery Active
J3973 Not reported 138 100 Battery Active
J1013 Not reported 138 80 Solar Withdrawn
J3924 Not reported 138 80 Battery Active
J1206 Not reported 138 50 Gas Withdrawn
J1207 Not reported 138 50 Gas Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first