Substation Scout

MISO request J3973

MISO queue ID J3973

Queue request J3973 was listed in the MISO interconnection queue at the end of 2025 as a 100 MW battery project in Branch County, MI, according to Berkeley Lab’s queue data file. The filing names COLDWATER - MOORE ROAD as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of October 1, 2030.

Queue IDJ3973
Project nameNot reported
Status (as published)Active
SubstationCOLDWATER - MOORE ROAD
Point of interconnectionCOLDWATER - MOORE ROAD 138.0kV
CountyBranch
StateMI
Voltage138 kV
Capacity100 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2030-10-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

COLDWATER - MOORE ROAD substation: 4 requests in the MISO queue, 4 active totaling 510 MW.

Queue IDProjectMWResourceStatus
J1658Not reported180SolarActive
J3722Not reported150SolarActive
J3924Not reported80BatteryActive

Branch, MI: 17 requests in the MISO queue, 13 active totaling 3,125 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityMETC
ClusterDPP Cycle Pending East (ITC)
Interconnection serviceNRIS
Project typeGeneration
Queue date2025-03-05

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.