Substation Scout

MISO request J3922

MISO queue ID J3922

Queue request J3922 was listed in the MISO interconnection queue at the end of 2025 as a 1,445 MW gas project in Branch County, MI, according to Berkeley Lab’s queue data file. The filing names HIPLE as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of March 1, 2030.

Queue IDJ3922
Project nameNot reported
Status (as published)Active
SubstationHIPLE
Point of interconnectionHIPLE
CountyBranch
StateMI
VoltageNot reported
Capacity1,445 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2030-03-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

HIPLE substation: 3 requests in the MISO queue, 3 active totaling 1,845 MW.

Queue IDProjectMWResourceStatus
J2213Not reported200BatteryActive
J3291Not reported200BatteryActive

Branch, MI: 17 requests in the MISO queue, 13 active totaling 3,125 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityMETC
ClusterDPP Cycle Pending East (ITC)
Interconnection serviceNRIS
Project typeGeneration
Queue date2025-03-04

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.