MISO request J1916

MISO queue ID J1916

Queue request J1916 was listed in the MISO interconnection queue at the end of 2025 as a 100 MW solar project in Branch County, MI, according to Berkeley Lab’s queue data file. The filing names NEWTON as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of March 6, 2026.

Queue IDJ1916
Project nameNot reported
Status (as published)Active
SubstationNEWTON
Point of interconnectionNEWTON
CountyBranch
StateMI
VoltageNot reported
Capacity100 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2026-03-06
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

NEWTON substation: 2 requests in the MISO queue, 1 active totaling 100 MW.

Queue IDProjectMWResourceStatus
J2688Not reported130HybridWithdrawn

Branch, MI: 17 requests in the MISO queue, 13 active totaling 3,125 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityMETC
ClusterDPP-2021 East (ITC)
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Cluster Study
Study phase (as the queue printed it)Study Phase: DPP 3; Post GIA Status: Not Started
Queue date2023-10-19
Interconnection agreement date2025-07-16

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first