Substation Scout

Triada substation interconnection queue

2 active projects totalling 985.6 MW in the ERCOT queue.

2active projects
985.6active MW
2total filed
Queue IDProjectkVMWResourceStatus
20INR0047 Siete 345 492.8 Wind SS Completed, FIS Started, IA
27INR0536 Siete Wind 345 492.8 Wind SS Completed, FIS Started, No IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.