Lobo substation interconnection queue
3 active projects
totalling 816.4 MW in the ERCOT queue.
3 active projects
816.4 active MW
3 total filed
Queue ID Project kV MW Resource Status
27INR0077
Cuchillas BESS
345
306.9
Battery
SS Completed, FIS Started, No IA
24INR0059
Cuchillas Solar
345
305.6
Solar
SS Completed, FIS Completed, IA
22INR0257
Corazon Solar Phase II
345
203.9
Solar
SS Completed, FIS Started, IA
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with ERCOT before relying on these figures.
Site Scanner draws on HIFLD substations and electric retail service
territories, USGS watershed boundaries, FEMA flood hazard layers and US Census
geocoding. Queue data is compiled from public interconnection
queue filings. Every figure carries its source and retrieval date.
A withdrawal records that a request left the queue. It says
nothing about injection capacity at that location. Verify with the relevant ISO before
relying on any figure. Queue datasets are tracked separately and are
not directly comparable: status vocabularies, fuel coding, and publication
cadence all differ.
Screening aid only. Not a system impact study. Contiguous US.