Tap LaQuinta - Bruni substation interconnection queue
2 active projects totalling 201.3 MW in the ERCOT queue.
2active projects
201.3active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| 25INR0321 | El Molino Solar SLF | 138 | 201.3 | Solar | SS Completed, FIS Started, No IA |
| 25INR0322 | El Molino Storage SLF | 138 | 0 | Battery | SS Completed, FIS Started, No IA |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.