Substation Scout

Tap Valley South – Anna Switch substation interconnection queue

3 active projects totalling 795.4 MW in the ERCOT queue.

3active projects
795.4active MW
3total filed
Queue IDProjectkVMWResourceStatus
26INR0605 White Bright BESS 345 313.7 Battery SS Completed, FIS Started, No IA
26INR0300 Whitewright Solar 2 345 301.7 Solar SS Completed, FIS Started, No IA
28INR0286 2 Cedar Wind 345 180 Wind SS Completed, FIS Started, No IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.