Grayson, TX interconnection queue

4 active projects totalling 1,286.7 MW in the ERCOT queue.

4active projects
1,286.7active MW
4total filed
Queue IDProjectkVMWResourceStatus
28INR0108 RAYBURN ENERGY STATION II Gas (TEF-Due Diligence) 138 570 Gas SS Completed, FIS Started, IA
26INR0605 White Bright BESS 345 313.7 Battery SS Completed, FIS Started, No IA
26INR0300 Whitewright Solar 2 345 301.7 Solar SS Completed, FIS Started, No IA
27INR0234 Lima Solar Project 138 101.3 Solar SS Completed, FIS Started, IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.