Tap # San Diego - # Orange Grove substation interconnection queue

2 active projects totalling 91.9 MW in the ERCOT queue.

2active projects
91.9active MW
2total filed
Queue IDProjectkVMWResourceStatus
27INR0249 Raghorn Solar SLF 69 91.9 Solar SS Completed, FIS Started, No IA
27INR0259 Raghorn Storage SLF 69 0 Battery SS Completed, FIS Started, No IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.