Raghorn Solar SLF
ERCOT queue ID 27INR0249
| Queue ID | 27INR0249 |
|---|---|
| Project name | Raghorn Solar SLF |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | Tap # San Diego - # Orange Grove |
| Point of interconnection | Tap 69kV #5654 San Diego - #5658 Orange Grove |
| County | Jim Wells |
| State | TX |
| Voltage | 69 kV |
| Capacity | 91.9 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalised for filtering) |
| Target commercial operation | 2028-05-31 |
| Source dataset | large |
Additional filed fields
| Interconnecting Entity | Raghorn Solar LLC |
|---|---|
| Cdr Zone | SOUTH |
| Fuel Code | SOL |
| Technology Code | PV |
| Screening Study Complete | 45520 |
| Water Availability | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.