Jim Wells, TX interconnection queue
5 active projects totalling 276.3 MW in the ERCOT queue, plus 1 with terminal status (shown greyed).
5active projects
276.3active MW
6total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| 27INR0249 | Raghorn Solar SLF | 69 | 91.9 | Solar | SS Completed, FIS Started, No IA |
| 29INR0090 | Bandana Solar SLF | n/r | 86.9 | Solar | Inactive |
| 27INR0307 | Beaverhead Solar SLF | 69 | 61.5 | Solar | SS Completed, FIS Started, No IA |
| 27INR0308 | Beaverhead Storage SLF | 69 | 61.5 | Battery | SS Completed, FIS Started, No IA |
| 23INR0331 | Orange Grove BESS | 138 | 61.4 | Battery | SS Completed, FIS Started, IA |
| 27INR0259 | Raghorn Storage SLF | 69 | 0 | Battery | SS Completed, FIS Started, No IA |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.