Direct to Sub # Ben Bolt. substation interconnection queue

2 active projects totalling 123 MW in the ERCOT queue.

2active projects
123active MW
2total filed
Queue IDProjectkVMWResourceStatus
27INR0307 Beaverhead Solar SLF 69 61.5 Solar SS Completed, FIS Started, No IA
27INR0308 Beaverhead Storage SLF 69 61.5 Battery SS Completed, FIS Started, No IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.