Tap ROSSVILLESB8 () to OAKSSW8 () substation interconnection queue

2 active projects totalling 101.1 MW in the ERCOT queue.

2active projects
101.1active MW
2total filed
Queue IDProjectkVMWResourceStatus
28INR0208 Strawberry Dunes Solar SLF 138 101.1 Solar SS Completed, FIS Started, No IA
28INR0209 Strawberry Dunes BESS SLF 138 0 Battery SS Completed, FIS Started, No IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.